Welcome: SHANDONG YESMORE LOGISTICS CO.,LTD
Language: Chinese ∷  English

Entreprise's news

The first China-Europe freight train with full schedule at home and abroad arrives in Duisburg, Germany

At 22:30 on November 5th, German time (5:30 on November 6th, Beijing time), the first domestic and overseas train from Xi'an, China to Duisburg, Germany, will be scheduled for the first time, fully loaded with photovoltaic inverters. , electric compressors, vacuum cleaners and other goods, running 9908 kilometers, took 11 days, 1 hour and 35 minutes to arrive in Duisburg, Germany, which marked the first time that the China-Europe trains in the China section, the wide-gauge section, and the European section have achieved the full run-through. There is a more stable expectation for the transportation time between the domestic departure station and the German terminal station, and the high-quality development of China-Europe freight trains has entered a new stage.


In order to further enhance the market competitiveness of China-Europe freight trains and provide customers with more stable transportation timeliness, the railway departments of China, Germany and other seven countries have jointly formulated the "Measures for Compilation and Cooperation of China-Europe Railway Express Full Timetable". At the beginning of this year, the Railway Group Co., Ltd. started the preparation of the full timetable for the China-Europe trains on 4 routes from China to Europe. The whole timetable from Xi'an to Duisburg, Germany was compiled, and from October 26, the trial operation was officially launched between Xi'an and Duisburg.

Compared with ordinary trains, the "full timetable" trains have fixed train numbers, routes, schedules and operating hours in each transportation section, and focus on reasonable control over the operation links such as refitting and handover at entry and exit ports to fully guarantee Its domestic and overseas transportation time is more stable. The Xi'an-Duisburg China-Europe train is scheduled for the whole journey, passing through China, Kazakhstan, Russia, Belarus, Poland and Germany, covering a total distance of 9,908 kilometers. The trial operation was a complete success. The second full-time schedule train has departed on time from Xi'an on November 2. The operation and organization of railway departments in various countries will be smoother and more mature. The full-time schedule China-Europe train will provide customers with more stable transportation timeliness, better Maintain smooth international industrial chains and supply chains.

Quoted from China Railway


CONTACT US

Contact: Jane Wang

Phone: +8613287005502

Tel: +86 533 3595637

Email: info@zbyesmore.com jane@zbyesmore.com

Add: Shandong,China

Scan the qr codeClose
the qr code